The building work continues to progress well inside the Church, East Wing and the Link Building. Some of the work is visible from the roadside but a lot is happening ‘behind the scenes’. Here is a preview of the design for one of the Link Building windows. The glass will be delivered shortly and installation of the windows will commence in the coming weeks. The stained-glass window is also due to be installed in its new location in the Church mid-April.